Skip to main content

Missouri Energy Profile

MISO/SPP
Grid Seam
HVDC Corridor
Proposed Route
Ameren
Major Utility
Evergy
Kansas City

Missouri sits at the crossroads of MISO and SPP, making it a key state for interregional transmission. A major HVDC transmission project would deliver thousands of MW of Kansas wind through the Tiger Connector. Meta's data center in Kansas City and growing St. Louis metro demand are driving infrastructure investment.

→ Ameren → MISO News
⚡ Energy Profile
12.9¢
Residential Rate
#38 in US
7.9¢
Industrial Rate
per kWh
67 TWh
Generation
#22 in US
21.2 GW
Capacity
summer peak
Coal
Primary Source
for generation
45.9M
CO₂ (metric tons)
#9 in US
Grid Operator
RTO/ISO
Capacity Mix
35%
39%
9%
8%
Coal 35%Gas 39%Nuclear 4%Wind 9%Solar 1%Hydro 4%Other 8%
Kansas City Power & Light Co (Missouri)
🏠 Residential
Residential General Use · Time-of-Use
10.93¢
≤ 600 kWh
6.55¢
≤ 1,000 kWh
5.47¢
All remaining
Fixed: $9.00/mo
🏢 Commercial
Small General Service Schedule SGS (200-999kW) Secondary… · Time-of-Use
14.68¢
≤ 180 kWh/kW
6.97¢
≤ 360 kWh/kW
6.21¢
All remaining
Fixed: $92.64/mo · Demand: $2.65/kW
🏭 Industrial
Large Power Service (Schedule LPS) Primary · Time-of-Use
7.64¢
≤ 180 kWh/kW
4.80¢
≤ 360 kWh/kW
2.51¢
All remaining
Fixed: $961.50/mo · Demand: $4.40–$12.21/kW (8 tiers)
4.25
Annual GHI
kWh/m²/day
4.59
Annual DNI
kWh/m²/day
94%
vs National Avg
(4.5 kWh/m²/day)
⛅ Average solar potential, slightly below national average
Monthly GHI (kWh/m²/day)
2.2
Jan
3.0
Feb
4.0
Mar
5.0
Apr
5.9
May
6.3
Jun
6.4
Jul
5.7
Aug
4.8
Sep
3.3
Oct
2.4
Nov
2.0
Dec
Measured at Kansas City
1,400
EV Stations
3,366
Charging Ports
Alternative Fuel Stations
20
⛽ CNG
3
🧊 LNG
58
🔥 LPG
141
🌽 E85
156
🌿 Biodiesel