THE DAILY MINE โ›๏ธ

Friday, February 6, 2026

Amazon just dropped a bomb: $200 billion in capex this year โ€” mostly data centers. Stock down 11%. The AI spending war is on.
 

๐Ÿ”ฅ Top Stories

AMAZON DROPS $200 BILLION BOMB: Capex mostly for AWS data centers
CNBC โ€” Stock plunges 11%; Jassy says "not a quixotic top-line grab"

BLOOM ENERGY UP 400%: The AI boom's unlikely poster child outpaces Nvidia
Axios โ€” Data centers can't wait for the grid; 44% plan to go fully on-site by 2035

$35 BILLION GONE: US clean energy projects gutted in 2025
Grist โ€” For every $1 announced, $3 was cancelled; rest of world doubling down

FUSION BREAKTHROUGH: Pacific Fusion cuts reactor costs by 60%
WebProNews โ€” No superconducting magnets needed; could compete with gas peakers

 

โšก Power & Grid

WIND WARNING: EEI chief says stalling offshore projects will raise rates
Washington Examiner โ€” "Ultimately, it's a cost that's going to be borne by the customer"

MAINE'S BILL SHOCK: Natural gas โ€” not renewables โ€” driving high prices
Canary Media โ€” State energy report debunks clean energy scapegoating

DATA CENTERS DRAFTED: DOE ordered backup generators on during storm
The Conversation โ€” Energy Secretary tapped 35 GW of industrial diesel capacity

12 STATES REVOLT: Higher electric rates for data centers as bills soar
Stateline โ€” Oregon led the way; Delaware, Florida, Oklahoma following suit

 

๐Ÿ–ฅ๏ธ Data Centers

NEW YORK FREEZE: Democrats propose moratorium on data center construction
Politico โ€” Bill would halt new builds until environmental, energy cost rules crafted

MUSK'S MOONSHOT: Data centers in space, powered by solar
AP โ€” SpaceX-xAI merger aims for a million satellites; experts skeptical

NC'S HIDDEN COSTS: AI boom collides with climate goals
WRAL โ€” Hyperscale facilities rivaling entire cities in power consumption

 

โšก Quick Hits

โ†’ 49ers blame injuries on electrical substation โ€” Super Bowl conspiracy? (NBC News)

โ†’ Michigan's Consumers Energy nears 1 GW data center deal (MLive)

โ†’ Brookings: Data center boom not delivering local prosperity (Brookings)

โ†’ Oklahoma proposes ratepayer protections from data centers (Journal Record)

 

๐Ÿ“Š Stat of the Day

$200B

Amazon's 2026 capex โ€” $50B above expectations, mostly for data centers

 

thedailymine.co

Energy news. No spin. Every morning.

Share with a friend  ยท  ๐•  ยท  Unsubscribe

Built by Stephen Nittler

ยฉ 2026 The Daily Mine